  1. All timber shall be measured as the nett length, unless otherwise stated and all sizes given are finishing sizes.

  2. A.B. All timber shall be well seasoned and treated against termite attack before fixing in position.

  3. Rates for carpentry shall include for

    1. Any type of cutting required sewing, notching, drilling, trimming framing jointing, splayed edges and the like hoisting and fixing in position completed with nails, spikes, plugs screws, and glueing and priming to joints and ends.
    2. Forming splayed edge, grooves, champers, scribed and rounded edge, bevelling moulding and the like.
    3. Plugging, wedging, nuts and washers with bolts, spokets ad pins and the like.
    4. Rebating, sinkings, grooving, morticing
    5. Additional timber length required for carpentry jointing particularly in the timber length exceed 5m.
  1. Protection and keeping cleaning for staining polishing or painting.
    (g) Nogging or solid bridging cut between studs or joints for structural timber in addition to above clause.

  2. In case of roof trusses rolls, drips and fillets, required in additions to above clauses.

  3. In case of floor and roof decking, the rate shall include for machine sanding protecting and prepare surface to receive floor paint in addition to clauses (a) to (g) or C above.

  4. In case of walls and ceiling lining, the rates shall include for jointing and fixing to walls / ceiling / eaves etc. All cover and joint strips in addition to clause (a) to (g) of C above.

  5. In case of corrugated asbestos wall lining the rates shall include for cove mouldings, sills stiles and head mouldings, to opening as relevant.

  6. In case of felts and insulation, no deduction have been made for area of joints, struts, rafters etc and rate shall include for laps batten fixing and laps.

  7. In case of Gutter boarding the rate shall include for outlet, and the like

  8. Back..

 



 

 

 









CONSULTANTS
Advice | Architects | Contractors | Consultants | Landscaping | InteriorDecor | Developers |
|
Government | Brokers | Surveyors | Apratments


PRODUCTS
Paints | Curtains | Lights | Furniture | Carpets | Air Conditioning | Security | Electrical | Granite | Marble | Fire | Insulation | Roof | Timber | Aluminium | Sanitaryware | Steel | Concrete | Scafolding | Chemicals

Best resolution 800 x 600 using MS Internet Explorer 4.00v or Higher........!
Copyright (C) 2001 Home Page (Pvt) Ltd. All rights reserved. Reproduction in whole or in part with out permission is prohibited