PRICING PREAMBLES
1.
GENERAL
- The
Contractor shall fully read and be conversant with full description
of workmanship and materials as described in the specification of
works for respective items, prior to the preparation of tender.
- All
quantities are measured generally in accordance with The Method of
Measurement of Building Works - Sri Lanka Standard 573: 1982 UDC 69
(083-74). In the absence of a method in aforesaid method of measurement,
the Standard Method of Measurement in Building Works in Sri Lanka
- Building Department shall apply. If any other deviation is made
to measure the quantities for any items of works, it is reflected
in the relevant item of work or stated in the relevant trade preamble
hereof.
- The
rate for each item must be comprehensive and must include for complying
in all respects with the requirements of the specification, the pricing
preambles, cover all the obligations under the contract, and all matter
and things necessary for the proper construction completion and maintenance
of works. No claim for additional payment will be allowed for any
error or misunderstanding by the Contractor of the work involved.
- The
Contractor must obtain all detailed information from the relevant
authorities as to the existence of service lines (underground and
overhead), such as power cables, drainage lines, water pipes, and
the like, and should check as to weather they are to be protected,
altered, or removed, and to do the necessary as the case may be. If
it is to be altered or diverted as directed by the Employer as a part
of design requirement, the cost in connection with such works shall
be paid to the Contractor by Employer on a mutually agreed basis,
provided such works are not separately measured, or not included in
the cost of other items of work, and/or not covered by the preamble
notes under relevant trade/ section.
-
- The
rates of each item shall include for :
- Labour
and all costs in connection.
- Materials
and goods including all costs in connection.
- Samples
to be given for approval.
- Setting
out of works and preparatory works.
- Complying
with regulations of urban councils or municipal councils and/or
any other relevant authorities under whose permission the particular
item of work shall be executed.
- Fitting
and fixing materials and goods in position including hoisting
to any height or lowering to any depth and all temporary works,
including loading, transporting, unloading, and storing.
- Square
cutting, waste materials, testing, and furnishing of test certificates.
- Preliminaries
unless otherwise separately priced.
- Protecting
and cleaning works during construction and on completion.
- Establishment
charges, overheads, and profits
- Where
the word "allow" occurs the costs of items shall be at the
risk of the Contractor.
- The
Contractor is to refer preamble notes of the relevant trade for any
item of work, or which has been described together with any other
item of works under a different trade, during pricing.
- The
word "fix only" used hereinafter in connection with goods
or materials supplied by Employer, Nominated Suppliers, or others,
shall be deemed to include, on the part of the Contractor taking delivery,
loading and transporting to site, unloading, stacking or storing under
cover if damage could occur by exposure to weather, taking from store
and distributing to job, handling, and hoisting. Contractor must allow
for the full cost of replacement of items which are damaged, broken,
lost, or stolen, after accepting delivery.
- The
system allowed in numbering the trade in this pricing preamble is
as per same sequence in Method of Measurement of Building Works Sri
Lanka Standard 573-1982- UDC 69(083-74).
- A separate
item is provided in the BOQ for the construction of temporary bus
shelters and the covered fence, temporary gates infront only.
- For
the Construction of the kerbs the tenderer must allow in his rates,
for any excavation of the hard shoulder constructed for temporary
bus stops and any abortive work to install permanent features
|
|
|