Factory complex, 3 storey office building with partitioning and interior
work and 2 storey canteen building. Inclusive of road work, storm water
and drainage system, underground water sump. Fire hydrant, detection and
alarm system, perimeter fencing, gates, security sheds and landscaping.
Electrical work consisting of 2500 Amp MSB, power distribution system,
lighting system, perimeter lighting and pipe music system. Complete air
conditioning system consisting of 340 Ton Chiller, 05 Nos. AHUs, 12 Nos.
fan coil unitys, A/C pumps, piping, controls, ducting work.
Total Floor Area approx. 100,000 sq.ft and the value of same in US $ 1,
430,000.00
Construction Period - 9 Months.